An offgrid system to completely solve the energy of the tourist camp.

An offgrid system to completely solve the energy of the tourist camp.

  • Project Name: An offgrid system to completely solve the energy of the tourist camp.
  • System Capacity:15 kW
  • Ordered Company:"Khomiin Taliin Takhi" NGO
  • Annual Yield Forecast: 19.26 MWh
  • Role of G-Power: EPC
  • Delivered Date: July 2022
Share:

Project Info:

A 15kW offgrid system with a 96kW*h ESS charger to provide electric consumption for the tourist camp in Khomiin Tal, Durvuljin Sum, Zavkhan Province.